Jacksboro, Jack County, Texas · ERCOT · operated by Jack County Power, LLC · owned by LS Power Development, LLC
2023 · headline year
Reported fuel cost$118M2023 · reported deliveries
Capacity in service1,280MW6 units · gas
Net generation6.25TWh2023 · reported
CO₂ emitted2.44Mt2023 · reported to EPA · 229th highest of 6,030 in the US
Rank in Texas#17of 941 · by capacity · #202 of 13,147 US
Reported suppliers112023 · 56 deliveries
Capacity factor56%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 45.2 TBtu · reported
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
6 of 6 shown · 1,280 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit ST1
300.0
Natural Gas
Natural Gas Fired Combined Cycle
2006
Operating
Unit ST2
300.0
Natural Gas
Natural Gas Fired Combined Cycle
2011
Operating
Unit CT1
170.0
Natural Gas
Natural Gas Fired Combined Cycle
2006
Operating
Unit CT2
170.0
Natural Gas
Natural Gas Fired Combined Cycle
2006
Operating
Unit CT3
170.0
Natural Gas
Natural Gas Fired Combined Cycle
2011
Operating
Unit CT4
170.0
Natural Gas
Natural Gas Fired Combined Cycle
2011
Operating
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 11 suppliers. Subscribe to see all 11, every one of the 1,398 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by LS Power Development, LLC (100%) and operated by Jack County Power, LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2009. The oldest operating units are Unit ST1, Unit CT1 and Unit CT2 (2006); the newest are Unit ST2, Unit CT3 and Unit CT4 (2011).
When is it due to retire?
No retirement date has been filed for any operating unit at Jack County Generation Facility. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 11 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $118M in 2023.
How much CO₂ does it emit?
2.44 Mt in 2023, reported to the EPA — the 229th highest of 6,030 US facilities that reported. Up from 1.69 Mt in 2011.