AMERICAN ENERGY ATLAS
Power·Massachusetts

IXYS - Beverly

Essex County, Massachusetts · ISO-NE · operated by IXYS Integrated Circuits Division, LLC

2023 · headline year
Fuel spend$6,7782023 · estimate
Capacity in service2.7MW4 units · gas + oil
Net generation23MWh2023 · reported
Rank in Massachusetts#342 (tied)of 666 · by capacity · #9,246 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Essex County · ISO-NE · NPCC

What it burns

2023 · reported

Share of reported fuel consumption

59% Oil & petroleum · 206 MMBtu · reported · $4,960 est.41% Natural gas · 141 MMBtu · reported · $1,817 est.

Oil & petroleum supplies 59% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs IXYS - Beverly an estimated 1.9× more than natural gas — and oil & petroleum is 1 of its 4 operating units and 22% of operating capacity.

Reported fuel consumption, MMBtu · 2020–23

0200400600202020222023
Reported (through 2023)

Generating units

4 of 4 shown · 2.7 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit NG10.7Natural GasNatural Gas Internal Combustion Engine2019Operating
Unit NG20.7Natural GasNatural Gas Internal Combustion Engine2019Operating
Unit NG30.7Natural GasNatural Gas Internal Combustion Engine2019Operating
Unit EG10.6Distillate oilPetroleum Liquids1997Operating

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
IXYS Integrated Circuits Division, LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
64382

Common questions

How big is IXYS - Beverly?
2.7 MW across 4 generating units in service — 2.1 MW of natural gas and 0.6 MW of oil.
Who owns and operates it?
Operated by IXYS Integrated Circuits Division, LLC, filed as industrial.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2014. The oldest operating unit is Unit EG1 (1997); the newest are Unit NG1, Unit NG2 and Unit NG3 (2019).
When is it due to retire?
No retirement date has been filed for any operating unit at IXYS - Beverly. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum and natural gas.
How much does it spend on fuel?
An estimated $6,778 in 2023 — oil & petroleum $4,960 and natural gas $1,817. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Massachusetts energyAll facilities in the state→Hadley Solar NG, LLC2.7 MW operating capacity→ Holyoke Solar Cooperative at Mueller2.7 MW operating capacity→ Lakeville Solar2.7 MW operating capacity→ Natick Mall2.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming