Cook County, Illinois · PJM · operated by ITT Energy Tech Partners, LLC
Capacity shown is planned or not in service
A planned 8.2 MW natural gas internal combustion engine project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit GEN3 | 4.1 | Natural Gas | Natural Gas Internal Combustion Engine | 2026 | Proposed |
| Unit GEN4 | 4.1 | Natural Gas | Natural Gas Internal Combustion Engine | 2026 | Proposed |
| Unit GEN1 | 3.7 | Natural Gas | Natural Gas Fired Combustion Turbine | 1991 | Retired 2024 |
| Unit GEN2 | 3.7 | Natural Gas | Natural Gas Fired Combustion Turbine | 1991 | Retired 2024 |
All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit GEN3 | new unit | 2026 | 4.1 MW |
| Unit GEN4 | new unit | 2026 | 4.1 MW |