Inver Grove Heights, Dakota County, Minnesota · MISO · operated by Northern States Power Co - Minnesota · owned by Xcel Energy Inc
Natural gas supplies 66% of the fuel energy it burned in 2023.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 1 | 46.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 1972 | Operating |
| Unit 2 | 46.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 1972 | Operating |
| Unit 3 | 46.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 1972 | Operating |
| Unit 4 | 46.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 1972 | Operating |
| Unit 5 | 46.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 1972 | Operating |
| Unit 6 | 46.8 | Natural Gas | Natural Gas Fired Combustion Turbine | 1972 | Operating |
| Unit 7 | 1.8 | Distillate oil | Petroleum Liquids | 1997 | Standby |
| Unit 8 | 1.8 | Distillate oil | Petroleum Liquids | 1997 | Standby |
All 8 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 1 | retirement | 2026-12 | 46.8 MW |
| Unit 2 | retirement | 2026-12 | 46.8 MW |
| Unit 3 | retirement | 2026-12 | 46.8 MW |
| Unit 4 | retirement | 2026-12 | 46.8 MW |
| Unit 5 | retirement | 2026-12 | 46.8 MW |
| Unit 6 | retirement | 2026-12 | 46.8 MW |
| Unit 7 | retirement | 2026-12 | 1.8 MW |
| Unit 8 | retirement | 2026-12 | 1.8 MW |
| Supplier | Fuel | Delivered MMBtu | Tons | Mine of origin | Transport |
|---|---|---|---|---|---|
| Flint Hills | Oil & petroleum | 629,366 | n/a | n/a | Truck |
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 716 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
See the delivery history →