Interstate Paper LLC dba DSSmith Riceboro

Riceboro, Liberty County, Georgia · SOCO · operated by Interstate Paper LLC · owned by DS Smith PLC

2023 · headline year
Capacity in service14.5MW1 unit · biomass
Net generation104GWh2023 · reported
CO₂ emitted82,297t2023 · reported to EPA · 2,731st highest of 6,030 in the US
Rank in Georgia#132of 247 · by capacity · #4,977 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor82%2023

Location

Liberty County · SOCO · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

87% Black liquor · 5.5 TBtu · reported13% Natural gas · 0.801 TBtu · reported

Black liquor supplies 87% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 14.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 577A14.5Black liquorWood/Wood Waste Biomass1968Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
DS Smith PLC · 100%
Operating utility
Interstate Paper LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper, Waste
EPA facility ID
1004886
Balancing authority
SOCO
NERC region
SERC
Gas pipeline
Southern Star Central Gas Pipeline
EIA plant ID
54281

Common questions

How big is Interstate Paper LLC dba DSSmith Riceboro?
14.5 MW across 1 generating unit in service.
Who owns and operates it?
Owned by DS Smith PLC (100%) and operated by Interstate Paper LLC, filed as industrial.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1968.
When is it due to retire?
No retirement date has been filed for any operating unit at Interstate Paper LLC dba DSSmith Riceboro. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor and natural gas.
How much CO₂ does it emit?
82,297 t in 2023, reported to the EPA — the 2,731st highest of 6,030 US facilities that reported. Up from 57,999 t in 2011.

Related pages

Georgia energyAll facilities in the state→Terrora16.0 MW operating capacity→ Nottely15.9 MW operating capacity→ Lloyd Shoals14.4 MW operating capacity→ Imperial Savannah LP11.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming