Anchorage, Anchorage Municipality, Alaska · operated by Chugach Electric Assn Inc · owned by Chugach Electric Assoc Inc
2023 · headline year
The largest power plant in Alaska by capacity — 204 MW, 100% natural gas by fuel energy in 2023, first unit online in 2013.
Fuel spend$54.6M2023 · estimate
Capacity in service204MW4 units · gas
Net generation905GWh2023 · reported
CO₂ emitted416,500t2023 · reported to EPA · 1,033rd highest of 6,030 in the US
Rank in Alaska#1of 142 · by capacity · #1,379 of 13,147 US
Reported suppliers22023 · 24 deliveries
Capacity factor51%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 7.81 TBtu · reported · $54.6M est.
CO₂ emitted, t · 2012–2023
Reported (through 2023)
Generating units
7 of 7 shown · 204 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 4
57.5
Natural Gas
Natural Gas Fired Combined Cycle
2013
Operating
Unit 1 · plant 57036
48.8
Natural Gas
Natural Gas Fired Combined Cycle
2013
Operating
Unit 2 · plant 57036
48.8
Natural Gas
Natural Gas Fired Combined Cycle
2013
Operating
Unit 3 · plant 57036
48.8
Natural Gas
Natural Gas Fired Combined Cycle
2013
Operating
Unit 3 · plant 6293
16.3
Natural Gas
Natural Gas Fired Combustion Turbine
1969
Retired 2015
Unit 1 · plant 6293
15.0
Natural Gas
Natural Gas Fired Combustion Turbine
1964
Retired 2023
Unit 2 · plant 6293
15.0
Natural Gas
Natural Gas Fired Combustion Turbine
1965
Retired 2020
All 7 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; stack height; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 362 deliveries recorded 2013–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
204 MW across 4 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled. The total spans EIA plants 6293 and 57036, filed under one facility.
Who owns and operates it?
Owned by Chugach Electric Assoc Inc and operated by Chugach Electric Assn Inc, filed as cooperative. 2 owner stakes are filed on jointly held units.
How old is it?
The capacity-weighted average megawatt here came online in 2013. Every operating unit came online in 2013.
When is it due to retire?
No retirement date has been filed for any operating unit at International Station Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 2 suppliers in 2023.
How much does it spend on fuel?
An estimated $54.6M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
416,500 t in 2023, reported to the EPA — the 1,033rd highest of 6,030 US facilities that reported. Up from 53,651 t in 2012.