Selma, Dallas County, Alabama · SOCO · operated by International Paper Co-Riverdl · owned by International Paper Co
2023 · headline year
Fuel spend$46.2M2023 · estimate
Capacity in service66.0MW3 units · biomass + gas · 1 more on standby or out of service
Net generation463GWh2023 · reported
CO₂ emitted483,775t2023 · reported to EPA · 951st highest of 6,030 in the US
Rank in Alabama#53of 75 · by capacity · #3,130 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
67% Natural gas · 12.8 TBtu · reported · $46.2M est.33% Black liquor · 6.29 TBtu · reported
Natural gas supplies 67% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 66.0 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN4
38.2
Natural Gas
Natural Gas Fired Combined Cycle
1994
Standby
Unit GEN2
37.4
Black liquor
Wood/Wood Waste Biomass
1985
Operating
Unit GEN3
17.0
Natural Gas
Natural Gas Fired Combined Cycle
1994
Operating
Unit GEN1
11.6
Natural Gas
Natural Gas Steam Turbine
1967
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
66.0 MW across 3 generating units in service — 37.4 MW of biomass and 28.6 MW of natural gas. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by International Paper Co (100%) and operated by International Paper Co-Riverdl, filed as industrial.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1984. The oldest operating unit is Unit GEN1 (1967); the newest is Unit GEN3 (1994).
When is it due to retire?
No retirement date has been filed for any operating unit at International Paper-Riverdale Mill. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas and black liquor.
How much does it spend on fuel?
An estimated $46.2M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
483,775 t in 2023, reported to the EPA — the 951st highest of 6,030 US facilities that reported. Up from 322,754 t in 2011.