Millard County, Utah · LDWP · operated by Premium Energy Holdings
Capacity shown is planned or not in service
A planned 1,000 MW hydroelectric pumped storage project, filed to come online in 2028.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit HL001 | 250.0 | Water | Hydroelectric Pumped Storage | 2028 | Proposed |
| Unit HL002 | 250.0 | Water | Hydroelectric Pumped Storage | 2028 | Proposed |
| Unit HL003 | 250.0 | Water | Hydroelectric Pumped Storage | 2028 | Proposed |
| Unit HL004 | 250.0 | Water | Hydroelectric Pumped Storage | 2028 | Proposed |
All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit HL001 | new unit | 2028 | 250 MW |
| Unit HL002 | new unit | 2028 | 250 MW |
| Unit HL003 | new unit | 2028 | 250 MW |
| Unit HL004 | new unit | 2028 | 250 MW |