AMERICAN ENERGY ATLAS
Industrial + power·Indiana

Indiana Harbor Coke Company

East Chicago, Lake County, Indiana · MISO · operated by Cokenergy Inc · owned by Suncoke Energy Inc and DTE Energy Co

2023 · headline year
Fuel spend$5.14M2023 · estimate
Capacity in service94.6MW1 unit · other sources
CO₂ emitted1.07Mt2023 · reported to EPA · 573rd highest of 6,030 in the US
Rank in Indiana#63of 202 · by capacity · #2,561 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Lake County · MISO · RFC

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 94.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit TG1894.6Waste heatAll Other1998Operating

1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Cokenergy Inc
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Metals
Emissions
Most of this site's emissions come from its process or from biomass, not from purchased fossil fuel.
EPA facility ID
1007287
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
55066

Common questions

How big is Indiana Harbor Coke Company?
94.6 MW across 1 generating unit in service.
Who owns and operates it?
Owned by Suncoke Energy Inc and DTE Energy Co and operated by Cokenergy Inc, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1998.
When is it due to retire?
No retirement date has been filed for any operating unit at Indiana Harbor Coke Company. An absent date means none is currently filed, not that the plant will run indefinitely.
How much does it spend on fuel?
An estimated $5.14M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.07 Mt in 2023, reported to the EPA — the 573rd highest of 6,030 US facilities that reported. Up from 821,717 t in 2011.

Related pages

Indiana energyAll facilities in the state→Riverstart Solar Park III100 MW operating capacity→ Ironside Energy, LLC95.0 MW operating capacity→ Whitewater Valley93.9 MW operating capacity→ Indiana Harbor E 5 AC Station90.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming