Penobscot County, Maine · ISO-NE · operated by Stored Solar J&WE
2023 · headline year
Capacity in service27.5MW1 unit · biomass
Net generation13.5GWh2023 · reported
Rank in Maine#33of 245 · by capacity · #4,132 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor6%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Biomass · 258,901 MMBtu · reported
Reported fuel consumption, TBtu · 2011–2023
Reported (through 2023)
Generating units
1 of 1 shown · 27.5 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN1
27.5
Wood
Wood/Wood Waste Biomass
1987
Operating
1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years.
Operated by Stored Solar J&WE, filed as independent power producer.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1987.
When is it due to retire?
No retirement date has been filed for any operating unit at Indeck West Enfield Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?