Fuel spend$12.9M2023 · estimate
Capacity in service147MW2 units · gas
Net generation514GWh2023 · reported
CO₂ emitted226,908t2023 · reported to EPA · 1,441st highest of 6,030 in the US
Rank in New York#41of 1,018 · by capacity · #1,930 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor40%2023
All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
See the engineering record →
How big is Indeck-Corinth Energy Center?
147 MW across 2 generating units in service.
Who owns and operates it?
Which grid does it sell into?
NYISO (New York Independent System Operator) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 1995. Every operating unit came online in 1995.
When is it due to retire?
No retirement date has been filed for any operating unit at Indeck-Corinth Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $12.9M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
226,908 t in 2023, reported to the EPA — the 1,441st highest of 6,030 US facilities that reported. Down from 392,827 t in 2011.