AMERICAN ENERGY ATLAS
Industrial + power·Virginia

HP Hood LLC

Winchester, Frederick County, Virginia · PJM · operated by HP Hood LLC · owned by HP Hood LLC

2023 · headline year
Fuel spend$7.02M2023 · estimate
Capacity in service15.0MW1 unit · gas
Net generation92.5GWh2023 · reported
CO₂ emitted75,925t2023 · reported to EPA · 2,870th highest of 6,030 in the US
Rank in Virginia#125 (tied)of 230 · by capacity · #4,912 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor70%2023

Location

Frederick County · PJM · RFC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 1.02 TBtu · reported · $7.02M est.

CO₂ emitted, t · 2011–2023

030,00060,00090,000201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 15.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit HHOOD15.0Natural GasNatural Gas Fired Combustion Turbine2015Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
HP Hood LLC · 100%
Operating utility
HP Hood LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Other
EPA facility ID
1007515
Balancing authority
PJM
NERC region
ReliabilityFirst (RFC)
Gas pipeline
Washington Gas Light Company
EIA plant ID
59860

Common questions

How big is HP Hood LLC?
15.0 MW across 1 generating unit in service.
Who owns and operates it?
Owned by HP Hood LLC (100%) and operated by HP Hood LLC, filed as industrial.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at HP Hood LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas.
How much does it spend on fuel?
An estimated $7.02M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
75,925 t in 2023, reported to the EPA — the 2,870th highest of 6,030 US facilities that reported. Up from 26,126 t in 2011.

Related pages

Virginia energyAll facilities in the state→Caden Energix Pamplin LLC15.7 MW operating capacity→ Mt. Jackson Solar15.7 MW operating capacity→ Depot Solar Center, LLC15.0 MW operating capacity→ Puller Solar15.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming