AMERICAN ENERGY ATLAS
Power·South Carolina

Horry Land Fill Gas Site

Horry County, South Carolina · SC · operated by South Carolina Public Service Authority

2023 · headline year
Capacity in service4.2MW3 units · biomass
Net generation8.44GWh2023 · reported
Rank in South Carolina#119of 204 · by capacity · #7,980 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor23%2023

Location

Horry County · SC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 92,413 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

0100,000200,000300,000201120172023
Reported (through 2023)

Generating units

8 of 8 shown · 4.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit HG11.4Landfill gasLandfill Gas2001Operating
Unit HG21.4Landfill gasLandfill Gas2001Operating
Unit HG31.4Landfill gasLandfill Gas2003Operating
Unit 15.2Distillate oilPetroleum Liquidsnot reportedCanceled
Unit 25.2Distillate oilPetroleum Liquidsnot reportedCanceled
Unit 35.2Distillate oilPetroleum Liquidsnot reportedCanceled
Unit 45.2Distillate oilPetroleum Liquidsnot reportedCanceled
Unit HG41.1Landfill gasLandfill Gasnot reportedCanceled

All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
South Carolina Public Service Authority
Entity type
State-Owned Utility
Regulatory status
Regulated
Balancing authority
SC
NERC region
SERC
EIA plant ID
7958

Common questions

How big is Horry Land Fill Gas Site?
4.2 MW across 3 generating units in service. A further 5 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by South Carolina Public Service Authority, filed as state-owned utility.
Which grid does it sell into?
SC (South Carolina Public Service Authority) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. The oldest operating units are Unit HG1 and Unit HG2 (2001); the newest is Unit HG3 (2003).
When is it due to retire?
No retirement date has been filed for any operating unit at Horry Land Fill Gas Site. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

South Carolina energyAll facilities in the state→Cherokee Falls4.3 MW operating capacity→ Spartanburg Water System4.3 MW operating capacity→ Cameron Solar II4.1 MW operating capacity→ Hollidays Bridge Hydro4.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming