AMERICAN ENERGY ATLAS
Power·Kansas

Hoisington

Barton County, Kansas · SPP · operated by City of Hoisington - (KS)

2023 · headline year
Fuel spend$5,4882023 · estimate
Capacity in service10.9MW4 units · gas + oil
Net generation62MWh2023 · reported
Rank in Kansas#107of 173 · by capacity · #5,282 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Barton County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

65% Natural gas · 381 MMBtu · reported · $1,169 est.35% Oil & petroleum · 202 MMBtu · reported · $4,319 est.

Natural gas supplies 65% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Hoisington an estimated 7.0× more than natural gas.

Reported fuel consumption, MMBtu · 2011–2023

010,00020,00030,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 10.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 74.0Natural GasNatural Gas Internal Combustion Engine1966Operating
Unit 93.9Distillate oilPetroleum Liquids2023Operating
Unit 62.0Natural GasNatural Gas Internal Combustion Engine1961Operating
Unit 2A1.0Distillate oilPetroleum Liquids1996Operating
Unit 87.0Natural GasNatural Gas Internal Combustion Engine1981Retired 2021
Unit 10.2Distillate oilPetroleum Liquids1940Retired 2004

All 6 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Hoisington - (KS)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
SPP
NERC region
MRO
EIA plant ID
1286

Common questions

How big is Hoisington?
10.9 MW across 4 generating units in service — 6.0 MW of natural gas and 4.9 MW of oil. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by City of Hoisington - (KS), filed as municipally owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1988. The oldest operating unit is Unit 6 (1961); the newest is Unit 9 (2023).
When is it due to retire?
No retirement date has been filed for any operating unit at Hoisington. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $5,488 in 2023 — natural gas $1,169 and oil & petroleum $4,319. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Kansas energyAll facilities in the state→Osage City11.1 MW operating capacity→ West 14th Street11.0 MW operating capacity→ Girard10.8 MW operating capacity→ Sterling10.3 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming