AMERICAN ENERGY ATLAS
Power·California

HL Power

Lassen County, California · CAISO · operated by HL Power Company

2023 · headline year
Fuel spend$79,3502023 · estimate
Capacity in service36.2MW1 unit · biomass
Net generation205GWh2023 · reported
Rank in California#479 (tied)of 1,713 · by capacity · #3,871 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor65%2023

Location

Lassen County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Biomass · 3.09 TBtu · reported

Reported fuel consumption, TBtu · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

1 of 1 shown · 36.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN136.2WoodWood/Wood Waste Biomass1989Operating

1 unit shown. Behind it, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; ownership stakes where a unit is jointly held.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
HL Power Company
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
Gas pipeline
Tuscarora Gas Transmission Co
EIA plant ID
10777

Common questions

How big is HL Power?
36.2 MW across 1 generating unit in service.
Who owns and operates it?
Operated by HL Power Company, filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1989.
When is it due to retire?
No retirement date has been filed for any operating unit at HL Power. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned biomass.
How much does it spend on fuel?
An estimated $79,350 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Chula Vista Energy Center37.2 MW operating capacity→ FPL Energy Montezuma Winds LLC36.8 MW operating capacity→ Kingsburg Cogeneration Facility36.2 MW operating capacity→ Brea Expansion Plant35.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming