Hillsdale

Hillsdale County, Michigan · MISO · operated by Hillsdale Board of Public Wks

2023 · headline year
Fuel spend$17,4442023 · estimate
Capacity in service11.6MW2 units · gas
Net generation309MWh2023 · reported
Rank in Michigan#138of 258 · by capacity · #5,217 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor0%2023

Location

Hillsdale County · MISO · RFC

What it burns

2023 · reported

Share of reported fuel consumption

87% Natural gas · 2,983 MMBtu · reported · $8,355 est.13% Oil & petroleum · 431 MMBtu · reported · $9,089 est.

Natural gas supplies 87% of the fuel energy it burned in 2023. Per unit of heat, oil & petroleum costs Hillsdale an estimated 7.5× more than natural gas.

Reported fuel consumption, MMBtu · 2011–2023

010,00020,00030,000201120172023
Reported (through 2023)

Generating units

9 of 9 shown · 11.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 66.0Natural GasNatural Gas Internal Combustion Engine1976Operating
Unit 55.6Natural GasNatural Gas Internal Combustion Engine1973Operating
Unit 44.1Natural GasNatural Gas Internal Combustion Engine1960Retired 2018
Unit 33.5Natural GasNatural Gas Internal Combustion Engine1954Retired 2018
Unit 22.7Distillate oilPetroleum Liquids1947Retired 2018
Unit 101.8Distillate oilPetroleum Liquids2008Retired 2013
Unit 91.8Distillate oilPetroleum Liquids2008Retired 2013
Unit 71.6Distillate oilPetroleum Liquids2008Retired 2013
Unit 81.6Distillate oilPetroleum Liquids2008Retired 2013

All 9 units shown. Behind each one, AEA holds the full engineering record: co-firing fuels and fuel-switching times.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Hillsdale Board of Public Wks
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
MISO
NERC region
ReliabilityFirst (RFC)
EIA plant ID
1829

Common questions

How big is Hillsdale?
11.6 MW across 2 generating units in service. A further 7 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Hillsdale Board of Public Wks, filed as municipally owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1975. The oldest operating unit is Unit 5 (1973); the newest is Unit 6 (1976).
When is it due to retire?
No retirement date has been filed for any operating unit at Hillsdale. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum.
How much does it spend on fuel?
An estimated $17,444 in 2023 — natural gas $8,355 and oil & petroleum $9,089. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Michigan energyAll facilities in the state→Peavy Falls12.0 MW operating capacity→ Victoria Dam12.0 MW operating capacity→ Sumpter Energy Associates11.2 MW operating capacity→ Dafter11.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming