Yakima County, Washington · PACW · operated by Cypress Creek Renewables
Capacity shown is planned or not in service
A planned 80.0 MW solar photovoltaic project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 98936 | 80.0 | Solar | Solar Photovoltaic | 2026 | Proposed |
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 98936 | new unit | 2026 | 80.0 MW |