AMERICAN ENERGY ATLAS
Power·California

High Sierra Cogeneration Plant

Lassen County, California · CAISO · operated by Plumas Sierra Rural Electric Coop

2023 · headline year
Fuel spend$2.94M2023 · estimate
Capacity in service6.2MW2 units · gas
Net generation35.7GWh2023 · reported
Rank in California#837of 1,713 · by capacity · #6,311 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor66%2023

Location

Lassen County · CAISO · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 352,929 MMBtu · reported · $2.94M est.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 6.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ENG13.1Natural GasNatural Gas Internal Combustion Engine2010Operating
Unit ENG23.1Natural GasNatural Gas Internal Combustion Engine2010Operating

All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Plumas Sierra Rural Electric Coop
Entity type
Cooperative
Regulatory status
Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
57977

Common questions

How big is High Sierra Cogeneration Plant?
6.2 MW across 2 generating units in service.
Who owns and operates it?
Operated by Plumas Sierra Rural Electric Coop, filed as cooperative.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2010. Every operating unit came online in 2010.
When is it due to retire?
No retirement date has been filed for any operating unit at High Sierra Cogeneration Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $2.94M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

California energyAll facilities in the state→Desert Green Solar Farm LLC6.3 MW operating capacity→ SFDK Solar6.3 MW operating capacity→ B Braun Medical, Inc6.1 MW operating capacity→ Black Butte6.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming