AMERICAN ENERGY ATLAS
Power·Texas

High Lonesome Wind Power, LLC Hybrid

Upton County, Texas · ERCOT · operated by High Lonesome Wind Power, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service563MW3 units · wind + storage
Rank in Texas#78of 941 · by capacity · #628 (tied) of 13,147 US

Location

Upton County · ERCOT · TRE

Generating units

3 of 3 shown · 563 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit HILO449.5WindOnshore Wind Turbine2023Operating
Unit BA63.3StorageBatteries2023Operating
Unit HILO250.0WindOnshore Wind Turbine2023Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: turbine manufacturer, turbine count and hub height; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
High Lonesome Wind Power, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
62562

Common questions

How big is High Lonesome Wind Power, LLC Hybrid?
563 MW across 3 generating units in service — 500 MW of wind and 63.3 MW of storage.
Who owns and operates it?
Operated by High Lonesome Wind Power, LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2023. Every operating unit came online in 2023.
When is it due to retire?
No retirement date has been filed for any operating unit at High Lonesome Wind Power, LLC Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Onshore Wind Turbine (500 MW) and Batteries (63.3 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and onshore wind turbine) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Texas energyAll facilities in the state→Sweeny Cogeneration Facility572 MW operating capacity→ Harrison County Power Project570 MW operating capacity→ Hidalgo Energy Center551 MW operating capacity→ Quail Run Energy Center550 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming