Power·Texas
Hidden Lakes Reliability Project
Galveston County, Texas · ERCOT · operated by Evelyn Energy Storage LLC
Capacity shown is planned or not in service
Proposed
A planned 220 MW batteries project, filed to come online in 2025.
Planned capacity220MW1 unit · not yet in service
Location
Generating units
1 of 1 shown · none in service
1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →
Ownership & operations
- Operating utility
- Evelyn Energy Storage LLC
- Entity type
- Independent Power Producer
- Regulatory status
- Not Regulated
- Balancing authority
- ERCOT
- NERC region
- Texas RE (TRE)
- EIA plant ID
- 68809
Common questions
How big is Hidden Lakes Reliability Project?
220 MW across 1 unit, none of which is in service — all planned.
Who owns and operates it?
Operated by Evelyn Energy Storage LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
What does it run on?
Batteries (220 MW).
Related pages
Select a state