Fuel spend$5.38M2023 · estimate
Capacity in service35.9MW3 units · gas
Net generation68.3GWh2023 · reported
CO₂ emitted60,198t2023 · reported to EPA · 3,350th highest of 6,030 in the US
Rank in Minnesota#79of 767 · by capacity · #3,885 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor22%2023
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; stack height.
See the engineering record →
How big is Hibbing Public Utilities Commission?
35.9 MW across 3 generating units in service.
Who owns and operates it?
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 1981. The oldest operating unit is Unit 3 (1965); the newest is Unit 6 (1996).
When is it due to retire?
No retirement date has been filed for any operating unit at Hibbing Public Utilities Commission. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned natural gas, biomass and coal.
How much does it spend on fuel?
An estimated $5.38M in 2023 — natural gas $5.32M and coal $56,038. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
60,198 t in 2023, reported to the EPA — the 3,350th highest of 6,030 US facilities that reported. Down from 163,714 t in 2011.