CO₂ emitted1.2Mt2023 · reported to EPA · 517th highest of 6,030 in the US
Rank in Oregon#7of 278 · by capacity · #554 of 13,147 US
Reported suppliers12023 · 12 deliveries
Capacity factor55%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 22.6 TBtu · reported · $115M est.
CO₂ emitted, Mt · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 621 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN2
204.5
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
Unit GEN4
204.5
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
Unit GEN1
106.1
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
Unit GEN3
106.1
Natural Gas
Natural Gas Fired Combined Cycle
1996
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; ownership stakes where a unit is jointly held.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 174 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Hermiston Generating Co LP 50% of 4 units PacifiCorp 50% of 4 units
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Industry sector
Power Plants
EPA facility ID
1003652
Balancing authority
PACW
NERC region
WECC
EIA plant ID
54761
Common questions
How big is Hermiston Generating Company, L.P.?
621 MW across 4 generating units in service.
Who owns and operates it?
Owned by Perennial Power Holdings Inc and Pacificorp and operated by Hermiston Generating Co LP, filed as independent power producer. 2 owner stakes are filed on jointly held units.
Which grid does it sell into?
PACW (PacifiCorp - West) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1996. Every operating unit came online in 1996.
When is it due to retire?
No retirement date has been filed for any operating unit at Hermiston Generating Company, L.P. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $115M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
1.2 Mt in 2023, reported to the EPA — the 517th highest of 6,030 US facilities that reported. Up from 928,975 t in 2011.