Fuel spend$02023 · no purchased fuel
Capacity in service1.9MW2 units · wind + solar · incl. 0.2 MW online after 2023
Rank in Illinois#391 (tied)of 433 · by capacity · #10,688 (tied) of 13,147 US
All 2 units shown. Behind each one, AEA holds the full engineering record: turbine manufacturer, turbine count and hub height; panel technology, tracking and DC capacity.
See the engineering record →
How big is Heartland Community College?
1.9 MW across 2 generating units in service — 1.7 MW of wind and 0.2 MW of solar.
Who owns and operates it?
Operated by Heartland Community College, filed as commercial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. The oldest operating unit is Unit T01 (2012); the newest is Unit SO1 (2024).
When is it due to retire?
No retirement date has been filed for any operating unit at Heartland Community College. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Onshore Wind Turbine (1.7 MW) and Solar Photovoltaic (0.2 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (onshore wind turbine and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.