Havana, Mason County, Illinois · MISO · operated by Dynegy Midwest Generation Inc
last reported to the EPA in 2019
Retired 2019
Retired — its last generating unit went out of service in 2019, ending 718 MW of capacity.
Retired capacity718MW6 units · none in service
CO₂ emittedNot reported2023 · last reported 2019
Reported suppliersNot reported2023 · last deliveries 2019
Location
CO₂ emitted, Mt · 2011–19
Reported (through 2019)
Generating units
6 of 6 shown · none in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 6
488.0
Refined coal
Conventional Steam Coal
1978
Retired 2019
Unit 1
46.0
Residual oil
Petroleum Liquids
1947
Retired 2012
Unit 2
46.0
Residual oil
Petroleum Liquids
1947
Retired 2012
Unit 3
46.0
Residual oil
Petroleum Liquids
1948
Retired 2012
Unit 4
46.0
Residual oil
Petroleum Liquids
1950
Retired 2012
Unit 5
46.0
Residual oil
Petroleum Liquids
1950
Retired 2012
All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.