Hampden County, Massachusetts · ISO-NE · operated by City of Holyoke Gas and Electric Dept.
Retired — its last generating unit went out of service in 2019, ending 3.3 MW of capacity.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit ALBD | 0.5 | Water | Conventional Hydroelectric | 1982 | Retired 2019 |
| Unit GILA | 0.5 | Water | Conventional Hydroelectric | 1982 | Retired 2012 |
| Unit NONO | 0.5 | Water | Conventional Hydroelectric | 1982 | Retired 2019 |
| Unit TOM | 0.5 | Water | Conventional Hydroelectric | 1982 | Retired 2013 |
| Unit GILD | 0.4 | Water | Conventional Hydroelectric | 1982 | Retired 2013 |
| Unit ALBA | 0.3 | Water | Conventional Hydroelectric | 1999 | Retired 2019 |
| Unit C-AB | 0.3 | Water | Conventional Hydroelectric | 1982 | Retired 2012 |
| Unit C-C | 0.3 | Water | Conventional Hydroelectric | 1982 | Retired 2012 |
All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →