Maricopa County, Arizona · AZPS · operated by Copia Power
Capacity shown is planned or not in service
A planned 150 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit HARQ1 | 150.0 | Solar | Solar Photovoltaic | 2025 | Proposed |
1 unit shown. Behind it, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit HARQ1 | new unit | 2025 | 150 MW |