Rome, Floyd County, Georgia · SOCO · operated by Georgia Power Co
Capacity shown is planned or not in service · last reported to the EPA in 2019
A planned 57.5 MW batteries project, filed to come online in 2026.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit 5 | 57.5 | Storage | Batteries | 2026 | Proposed |
| Unit 4 | 578.0 | Bituminous coal | Conventional Steam Coal | 1970 | Retired 2019 |
| Unit 1 | 125.0 | Bituminous coal | Conventional Steam Coal | 1954 | Retired 2019 |
| Unit 2 | 125.0 | Bituminous coal | Conventional Steam Coal | 1954 | Retired 2019 |
| Unit 3 | 125.0 | Bituminous coal | Conventional Steam Coal | 1955 | Retired 2019 |
All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit 5 | new unit | 2026 | 57.5 MW |
Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.
See the delivery history →