Austin, Travis County, Texas · ERCOT · operated by University of Texas at Austin · owned by University of Texas System
2023 · headline year
Fuel spend$11.6M2023 · estimate
Capacity in service139MW4 units · gas · 2 more on standby or out of service
Net generation354GWh2023 · reported
CO₂ emitted237,789t2023 · reported to EPA · 1,407th highest of 6,030 in the US
Rank in Texas#390of 941 · by capacity · #1,977 of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2012
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 4.3 TBtu · reported · $11.6M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
10 of 10 shown · 139 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GEN8
48.5
Natural Gas
Natural Gas Fired Combined Cycle
1987
Operating
Unit GEN10
34.4
Natural Gas
Natural Gas Fired Combined Cycle
2010
Operating
Unit GEN7
28.8
Natural Gas
Natural Gas Fired Combined Cycle
1979
Operating
Unit GEN9
27.2
Natural Gas
Natural Gas Fired Combined Cycle
2004
Operating
Unit GEN4
7.6
Natural Gas
Natural Gas Fired Combined Cycle
1951
Out of service
Unit GEN5
6.0
Natural Gas
Natural Gas Fired Combined Cycle
1959
Standby
Unit GEN6
12.5
Natural Gas
Natural Gas Fired Combined Cycle
1968
Retired 2008
Unit GEN3
2.5
Natural Gas
Natural Gas Steam Turbine
1938
Retired 2001
Unit GEN1
1.5
Natural Gas
Natural Gas Steam Turbine
1933
Retired 2001
Unit GEN2
1.5
Natural Gas
Natural Gas Steam Turbine
1933
Retired 2001
All 10 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years.
139 MW across 4 generating units in service. A further 6 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by University of Texas System (100%) and operated by University of Texas at Austin, filed as state-owned utility.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 1994. The oldest operating unit is Unit GEN7 (1979); the newest is Unit GEN10 (2010).
When is it due to retire?
No retirement date has been filed for any operating unit at Hal C Weaver Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $11.6M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
237,789 t in 2023, reported to the EPA — the 1,407th highest of 6,030 US facilities that reported. Up from 213,463 t in 2011.