H F Lee Steam Electric Plant

Goldsboro, Wayne County, North Carolina · CPLE / DUK · operated by Duke Energy Progress - (NC) · owned by Duke Energy Corp

2023 · headline year
Reported fuel cost$283M2023 · reported deliveries
Capacity in service2,048MW9 units · gas
Net generation6.47TWh2023 · reported
CO₂ emitted2.64Mt2023 · reported to EPA · 207th highest of 6,030 in the US
Rank in North Carolina#7of 908 · by capacity · #69 of 13,147 US
Reported suppliers142023 · 125 deliveries
Capacity factor36%2023

Location

Wayne County · CPLE / DUK · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 48 TBtu · reported

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

16 of 16 shown · 2,048 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit ST1405.0Natural GasNatural Gas Fired Combined Cycle2012Operating
Unit 1A221.0Natural GasNatural Gas Fired Combined Cycle2012Operating
Unit 1B221.0Natural GasNatural Gas Fired Combined Cycle2012Operating
Unit 1C221.0Natural GasNatural Gas Fired Combined Cycle2012Operating
Unit 5198.9Natural GasNatural Gas Fired Combustion Turbine2009Operating
Unit 1 · plant 7538195.2Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit 2 · plant 7538195.2Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit 3 · plant 7538195.2Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit 4195.2Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit 3 · plant 2709252.4Bituminous coalConventional Steam Coal1962Retired 2012
Unit 1 · plant 270975.0Bituminous coalConventional Steam Coal1952Retired 2012
Unit 2 · plant 270975.0Bituminous coalConventional Steam Coal1951Retired 2012
Unit GT229.9Distillate oilPetroleum Liquids1971Retired 2012
Unit GT329.9Distillate oilPetroleum Liquids1971Retired 2012
Unit GT429.9Distillate oilPetroleum Liquids1971Retired 2012
Unit GT116.3Distillate oilPetroleum Liquids1968Retired 2012

All 16 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

Who supplies the fuel

1 of 14 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Twin Eagle Resource ManagementNatural gas8.8n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 14 suppliers. Subscribe to see all 14, every one of the 910 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 14 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Progress - (NC)
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000786
Balancing authority
CPLE / DUK
NERC region
SERC
EIA plant IDs
2709 · 7538 · 58215

Common questions

How big is H F Lee Steam Electric Plant?
2,048 MW across 9 generating units in service. A further 7 units are listed as standby, out of service, planned, retired or canceled. The total spans EIA plants 2709, 7538 and 58215, filed under one facility.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Progress - (NC), filed as investor-owned utility.
Which grid does it sell into?
CPLE / DUK (Duke Energy Progress East) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2007. The oldest operating units are Unit 1 · plant 7538, Unit 2 · plant 7538, Unit 3 · plant 7538 and Unit 4 (2000); the newest are Unit ST1, Unit 1A, Unit 1B and Unit 1C (2012).
When is it due to retire?
No retirement date has been filed for any operating unit at H F Lee Steam Electric Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 14 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $283M in 2023.
How much CO₂ does it emit?
2.64 Mt in 2023, reported to the EPA — the 207th highest of 6,030 US facilities that reported. Up from 1.37 Mt in 2011.

Related pages

North Carolina energyAll facilities in the state→Richmond County Combustion Turbine Plant2,245 MW operating capacity→ Marshall2,119 MW operating capacity→ Brunswick Nuclear2,003 MW operating capacity→ Cliffside1,530 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming