Byesville, Guernsey County, Ohio · PJM · operated by Guernsey Power Station LLC · owned by Guernsey Power Station LLC
2023 · headline year
The 2nd-largest power plant in Ohio by capacity — 2,055 MW, 100% natural gas by fuel energy in 2023, first unit online in 2023.
Fuel spend$132M2023 · estimate
Capacity in service2,055MW3 units · gas
Net generation8.15TWh2023 · reported
CO₂ emitted2.94Mt2023 · reported to EPA · 168th highest of 6,030 in the US
Rank in Ohio#2of 189 · by capacity · #67 of 13,147 US
Reported suppliers12023 · 11 deliveries
Capacity factor45%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 52.9 TBtu · reported · $132M est.
Generating units
3 of 3 shown · 2,055 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GPS1
685.0
Natural Gas
Natural Gas Fired Combined Cycle
2023
Operating
Unit GPS2
685.0
Natural Gas
Natural Gas Fired Combined Cycle
2023
Operating
Unit GPS3
685.0
Natural Gas
Natural Gas Fired Combined Cycle
2023
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 11 deliveries recorded 2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Guernsey Power Station LLC (100%) and operated by Guernsey Power Station LLC, filed as independent power producer.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2023. Every operating unit came online in 2023.
When is it due to retire?
No retirement date has been filed for any operating unit at Guernsey Power Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $132M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
2.94 Mt in 2023, reported to the EPA — the 168th highest of 6,030 US facilities that reported.