Avoca, Saint Clair County, Michigan · MISO · operated by DTE Electric Company · owned by DTE Energy Co
2023 · headline year
Fuel spend$32.3M2023 · estimate
Capacity in service1,071MW4 units · gas
Net generation1.03TWh2023 · reported
CO₂ emitted619,201t2023 · reported to EPA · 829th highest of 6,030 in the US
Rank in Michigan#12of 258 · by capacity · #283 of 13,147 US
Reported suppliers12023 · 11 deliveries
Capacity factor11%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 11.3 TBtu · reported · $32.2M est.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 1,071 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 1
815.4
Natural Gas
Natural Gas Steam Turbine
1979
Operating
Unit 11-1
85.3
Natural Gas
Natural Gas Fired Combustion Turbine
1999
Operating
Unit 11-2
85.3
Natural Gas
Natural Gas Fired Combustion Turbine
1999
Operating
Unit 11-3
85.3
Natural Gas
Natural Gas Fired Combustion Turbine
1999
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 179 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by DTE Energy Co (100%) and operated by DTE Electric Company, filed as investor-owned utility.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 1984. The oldest operating unit is Unit 1 (1979); the newest are Unit 11-1, Unit 11-2 and Unit 11-3 (1999).
When is it due to retire?
No retirement date has been filed for any operating unit at Greenwood. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
An estimated $32.3M in 2023 — natural gas $32.2M and oil & petroleum $87,257. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
619,201 t in 2023, reported to the EPA — the 829th highest of 6,030 US facilities that reported. Up from 226,977 t in 2011.