Operated by Green Cow Power LLC, filed as industrial.
Which grid does it sell into?
MISO (Midcontinent Independent Transmission System Operator, Inc.) is its balancing authority, inside NERC's ReliabilityFirst region.
How old is it?
The capacity-weighted average megawatt here came online in 2017. The oldest operating units are Unit ENG1, Unit ENG2 and Unit ENG3 (2015); the newest is Unit ENG4 (2021).
When is it due to retire?
No retirement date has been filed for any operating unit at Green Cow Power. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?