AMERICAN ENERGY ATLAS
Power·South Carolina

Great Falls (SC)

Chester County, South Carolina · DUK · operated by Duke Energy Carolinas, LLC

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service12.0MW4 units · hydro
Rank in South Carolina#72 (tied)of 204 · by capacity · #5,143 (tied) of 13,147 US

Location

Chester County · DUK · SERC

Generating units

8 of 8 shown · 12.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 13.0WaterConventional Hydroelectric1907Operating
Unit 23.0WaterConventional Hydroelectric1907Operating
Unit 53.0WaterConventional Hydroelectric1907Operating
Unit 63.0WaterConventional Hydroelectric1907Operating
Unit 33.0WaterConventional Hydroelectric1907Retired 2018
Unit 43.0WaterConventional Hydroelectric1907Retired 2018
Unit 73.0WaterConventional Hydroelectric1907Retired 2018
Unit 83.0WaterConventional Hydroelectric1907Retired 2018

All 8 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Ownership & operations

Operating utility
Duke Energy Carolinas, LLC
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Balancing authority
DUK
NERC region
SERC
EIA plant ID
3259

Common questions

How big is Great Falls (SC)?
12.0 MW across 4 generating units in service. A further 4 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Duke Energy Carolinas, LLC, filed as investor-owned utility.
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1907. Every operating unit came online in 1907.
When is it due to retire?
No retirement date has been filed for any operating unit at Great Falls (SC). An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Conventional Hydroelectric (12.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (conventional hydroelectric) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

South Carolina energyAll facilities in the state→Midway Green Solar12.8 MW operating capacity→ 99 Islands12.0 MW operating capacity→ Trask East Solar12.0 MW operating capacity→ Lee County Landfill11.2 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming