Hartford County, Connecticut · ISO-NE · operated by Gravel Pit Solar, LLC
Capacity shown is planned or not in service
A planned 120 MW solar photovoltaic project, filed to come online in 2025.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit GPS04 | 70.0 | Solar | Solar Photovoltaic | 2025 | Proposed |
| Unit GPS03 | 50.0 | Solar | Solar Photovoltaic | 2025 | Proposed |
All 2 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit GPS03 | new unit | 2025 | 50.0 MW |
| Unit GPS04 | new unit | 2025 | 70.0 MW |