Gordonsville, Louisa County, Virginia · PJM · operated by Virginia Electric & Power Co · owned by Dominion Energy Inc
2023 · headline year
Reported fuel cost$27M2023 · reported deliveries
Capacity in service300MW4 units · gas
Net generation918GWh2023 · reported
CO₂ emitted417,746t2023 · reported to EPA · 1,029th highest of 6,030 in the US
Rank in Virginia#24of 230 · by capacity · #995 of 13,147 US
Reported suppliers12023 · 36 deliveries
Capacity factor35%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 7.82 TBtu · reported
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 300 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit GOR1
97.2
Natural Gas
Natural Gas Fired Combined Cycle
1994
Operating
Unit GOR2
97.2
Natural Gas
Natural Gas Fired Combined Cycle
1994
Operating
Unit GOR3
53.0
Natural Gas
Natural Gas Fired Combined Cycle
1994
Operating
Unit GOR4
53.0
Natural Gas
Natural Gas Fired Combined Cycle
1994
Operating
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).
The supplier is shown. Subscribe to see every one of the 865 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by Dominion Energy Inc (100%) and operated by Virginia Electric & Power Co, filed as investor-owned utility.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1994. Every operating unit came online in 1994.
When is it due to retire?
No retirement date has been filed for any operating unit at Gordonsville Power Station. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas and oil & petroleum came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $27M in 2023.
How much CO₂ does it emit?
417,746 t in 2023, reported to the EPA — the 1,029th highest of 6,030 US facilities that reported. Up from 356,744 t in 2011.