AMERICAN ENERGY ATLAS
Power·Kansas

Gordon Evans Energy Center

Colwich, Sedgwick County, Kansas · SPP · operated by Evergy Kansas South, Inc · owned by Evergy Inc

2023 · headline year
Reported fuel cost$15.4M2023 · reported deliveries
Capacity in service375MW3 units · gas · 1 more on standby or out of service
Net generation438GWh2023 · reported
CO₂ emitted279,595t2023 · reported to EPA · 1,282nd highest of 6,030 in the US
Rank in Kansas#9of 173 · by capacity · #851 of 13,147 US
Reported suppliers22023 · 14 deliveries
Capacity factor13%2023

Location

Sedgwick County · SPP · MRO

What it burns

2023 · reported

Share of reported fuel consumption

99% Natural gas · 4.46 TBtu · reported1% Oil & petroleum · 0.0357 TBtu · reported

Natural gas supplies 99% of the fuel energy it burned in 2023.

CO₂ emitted, t · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 375 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GT3178.5Natural GasNatural Gas Fired Combustion Turbine2001Operating
Unit GT198.3Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit GT298.3Natural GasNatural Gas Fired Combustion Turbine2000Operating
Unit 52.9Distillate oilPetroleum Liquids1969Standby
Unit 2390.0Natural GasNatural Gas Steam Turbine1967Retired 2018
Unit 1136.0Natural GasNatural Gas Steam Turbine1961Retired 2018

All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit GT1uprate2026-060.0 MW
Unit GT2uprate2026-060.0 MW

Who supplies the fuel

1 of 2 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
Southern Star Central PipelineNatural gas4.46n/an/aPipeline

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 2 suppliers. Subscribe to see all 2, every one of the 174 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 2 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Evergy Inc · 100%
Operating utility
Evergy Kansas South, Inc
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1006735
Balancing authority
SPP
NERC region
MRO
Gas pipeline
Southern Star Central Gas Pipeline
EIA plant ID
1240

Common questions

How big is Gordon Evans Energy Center?
375 MW across 3 generating units in service. A further 3 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Evergy Inc (100%) and operated by Evergy Kansas South, Inc, filed as investor-owned utility.
Which grid does it sell into?
SPP (Southwest Power Pool) is its balancing authority, inside NERC's MRO region.
How old is it?
The capacity-weighted average megawatt here came online in 2000. The oldest operating units are Unit GT1 and Unit GT2 (2000); the newest is Unit GT3 (2001).
When is it due to retire?
No retirement date has been filed for any operating unit at Gordon Evans Energy Center. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas and oil & petroleum. Natural gas and oil & petroleum came from 2 suppliers in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $15.4M in 2023.
How much CO₂ does it emit?
279,595 t in 2023, reported to the EPA — the 1,282nd highest of 6,030 US facilities that reported. Down from 482,067 t in 2011.

Related pages

Kansas energyAll facilities in the state→Flat Ridge 2 Wind Energy LLC470 MW operating capacity→ West Gardner Generating Station408 MW operating capacity→ Nearman Creek365 MW operating capacity→ Holcomb349 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming