GMP Solar/Storage-Ferrisburgh Hybrid

Addison County, Vermont · ISO-NE · operated by Green Mountain Power Corp

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service7.0MW2 units · solar + storage
Rank in Vermont#26 (tied)of 118 · by capacity · #6,147 (tied) of 13,147 US

Location

Addison County · ISO-NE · NPCC

Generating units

2 of 2 shown · 7.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GMPSF5.0SolarSolar Photovoltaic2019Operating
Unit GMPBF2.0StorageBatteries2019Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
Green Mountain Power Corp
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
62382

Common questions

How big is GMP Solar/Storage-Ferrisburgh Hybrid?
7.0 MW across 2 generating units in service — 5.0 MW of solar and 2.0 MW of storage.
Who owns and operates it?
Operated by Green Mountain Power Corp, filed as investor-owned utility.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2019. Every operating unit came online in 2019.
When is it due to retire?
No retirement date has been filed for any operating unit at GMP Solar/Storage-Ferrisburgh Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (5.0 MW) and Batteries (2.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Vermont energyAll facilities in the state→Chace Mill Winooski One7.5 MW operating capacity→ Milton7.4 MW operating capacity→ GMP Solar/Storage-Milton Hybrid7.0 MW operating capacity→ Proctor6.9 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming