AMERICAN ENERGY ATLAS
Power·Vermont

GMP Solar - Panton Hybrid

Addison County, Vermont · ISO-NE · operated by Green Mountain Power Corp

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service5.9MW2 units · solar + storage
Rank in Vermont#32of 118 · by capacity · #6,420 (tied) of 13,147 US

Location

Addison County · ISO-NE · NPCC

Generating units

2 of 2 shown · 5.9 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GMPSP4.9SolarSolar Photovoltaic2016Operating
Unit GMPBP1.0StorageBatteries2018Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases; ownership stakes where a unit is jointly held.

See the engineering record →

Ownership & operations

Operating utility
Green Mountain Power Corp
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Balancing authority
ISO-NE
NERC region
NPCC
EIA plant ID
60562

Common questions

How big is GMP Solar - Panton Hybrid?
5.9 MW across 2 generating units in service — 4.9 MW of solar and 1.0 MW of storage.
Who owns and operates it?
Operated by Green Mountain Power Corp, filed as investor-owned utility.
Which grid does it sell into?
ISO-NE (ISO New England Inc.) is its balancing authority, inside NERC's NPCC region.
How old is it?
The capacity-weighted average megawatt here came online in 2016. The oldest operating unit is Unit GMPSP (2016); the newest is Unit GMPBP (2018).
When is it due to retire?
No retirement date has been filed for any operating unit at GMP Solar - Panton Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (4.9 MW) and Batteries (1.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Vermont energyAll facilities in the state→Peterson6.3 MW operating capacity→ Searsburg Wind Turbine6.0 MW operating capacity→ Beldens5.7 MW operating capacity→ Huntington Falls5.7 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming