Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only.
The supplier is shown. Subscribe to see every one of the 108 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.
Owned by City of Pasadena California (100%) and operated by City of Pasadena - (CA), filed as municipally owned utility.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2002. The oldest operating units are Unit GT1 and Unit GT2 (1976); the newest are Unit GT5 and Unit ST1 (2016).
When is it due to retire?
No retirement date has been filed for any operating unit at Glenarm. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas. Natural gas came from 1 supplier in 2023.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $4.83M in 2023.
How much CO₂ does it emit?
23,889 t in 2023, reported to the EPA — the 5,216th highest of 6,030 US facilities that reported. Down from 51,795 t in 2011.