AMERICAN ENERGY ATLAS
Power·Kentucky

Glasgow LFGTE

Barren County, Kentucky · PJM · operated by East Kentucky Power Coop, Inc

2023 · headline year
Capacity in service1.0MW1 unit · biomass
Net generation4.33GWh2023 · reported
Rank in Kentucky#58of 58 · by capacity · #12,215 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor49%2023

Location

Barren County · PJM · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 57,002 MMBtu · reported

Reported fuel consumption, MMBtu · 2015–23

030,00060,00090,000201520192023
Reported (through 2023)

Generating units

1 of 1 shown · 1.0 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 11.0Landfill gasLandfill Gas2015Operating

1 unit shown. Behind it, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
East Kentucky Power Coop, Inc
Entity type
Cooperative
Regulatory status
Regulated
Balancing authority
PJM
NERC region
SERC
EIA plant ID
60137

Common questions

How big is Glasgow LFGTE?
1.0 MW across 1 generating unit in service.
Who owns and operates it?
Operated by East Kentucky Power Coop, Inc, filed as cooperative.
Which grid does it sell into?
PJM (PJM Interconnection, LLC) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2015.
When is it due to retire?
No retirement date has been filed for any operating unit at Glasgow LFGTE. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Also at this site

Glasgow LandfillSame site→

Related pages

Kentucky energyAll facilities in the state→RA Jones Roof Mounted Solar System1.3 MW operating capacity→ L'Oreal Solar - Florence1.1 MW operating capacity→ Catlettsburg Refining, LLC2.24 Mt CO₂ in 2023→ Kosmos Cement Co1.32 Mt CO₂ in 2023→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming