Yolo County, California · CAISO · operated by Emeren US, LLC
Capacity shown is planned or not in service
A planned 26.0 MW solar photovoltaic project, filed to come online in 2027.
| Unit | Capacity MW | Fuel | Technology | Online | Status |
|---|---|---|---|---|---|
| Unit GSP1 | 13.0 | Solar | Solar Photovoltaic | 2027 | Proposed |
| Unit GSP2 | 13.0 | Storage | Batteries | 2027 | Proposed |
All 2 units shown. Behind each one, AEA holds the full engineering record: ownership stakes where a unit is jointly held.
See the engineering record →| Unit | Event | When | MW |
|---|---|---|---|
| Unit GSP1 | new unit | 2027 | 13.0 MW |
| Unit GSP2 | new unit | 2027 | 13.0 MW |