Georgia-Pacific Cedar Springs LLC

Cedar Springs, Early County, Georgia · SOCO · operated by Georgia-Pacific Cedar Springs LLC · owned by Koch Industries Inc

2023 · headline year
Fuel spend$52.5M2023 · estimate
Capacity in service101MW2 units · biomass
Net generation481GWh2023 · reported
CO₂ emitted571,921t2023 · reported to EPA · 869th highest of 6,030 in the US
Rank in Georgia#58 (tied)of 247 · by capacity · #2,347 (tied) of 13,147 US
Reported suppliers42023 · 47 deliveries
Capacity factor54%2023

Location

Early County · SOCO · SERC

What its on-site power plant burns

2023 · reported

Share of reported fuel consumption

68% Black liquor · 12.5 TBtu · reported18% Coal · 3.29 TBtu · reported · $23.1M est.9% Natural gas · 1.64 TBtu · reported · $10.4M est.6% Oil & petroleum · 1.03 TBtu · reported · $19M est.

Black liquor supplies 68% of the fuel energy its on-site power plant burned in 2023.

CO₂ emitted, Mt · 2011–2023

00.511.5201120172023
Reported (through 2023)

Generating units

2 of 2 shown · 101 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit GEN251.2Black liquorWood/Wood Waste Biomass1965Operating
Unit GEN150.0Black liquorWood/Wood Waste Biomass1963Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →
UnitEventWhenMW
Unit GEN1retirement2025-0750.0 MW
Unit GEN2retirement2025-0751.2 MW

Who supplies the fuel

1 of 4 suppliers · delivered in 2023
SupplierFuelDelivered TBtuTonsMine of originTransport
White River CoalCoal3.34132,117Yellow Creek #21, KentuckyRail

Figures are volumes delivered in 2023, not volumes burned. Tons are shown for coal only. Deliveries and consumption are reported separately and need not match in a year (stockpiles, and pipeline gas that fuel receipts do not capture).

Showing 1 of 4 suppliers. Subscribe to see all 4, every one of the 765 deliveries recorded 2011–2023, mine-level origins, transport mode and the delivered price paid — plus sorting, filtering and Excel export.

See all 4 suppliers →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Koch Industries Inc · 100%
Operating utility
Georgia-Pacific Cedar Springs LLC
Entity type
Industrial
Regulatory status
Not Regulated
Industry sector
Pulp and Paper, Waste
EPA facility ID
1002823
Balancing authority
SOCO
NERC region
SERC
EIA plant ID
54101

Common questions

How big is Georgia-Pacific Cedar Springs LLC?
101 MW across 2 generating units in service.
Who owns and operates it?
Owned by Koch Industries Inc (100%) and operated by Georgia-Pacific Cedar Springs LLC, filed as industrial.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 1964. The oldest operating unit is Unit GEN1 (1963); the newest is Unit GEN2 (1965).
When is it due to retire?
Planned retirement dates are filed for 2 of 2 operating units: Unit GEN1 (2025) and Unit GEN2 (2025).
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor, coal, natural gas and oil & petroleum. Coal delivered in 2023 came from 1 coal supplier, from mines in Kentucky — principally Yellow Creek #21. Other fuels (natural gas and oil & petroleum) came from 3 suppliers in 2023.
How much does it spend on fuel?
An estimated $52.5M in 2023 — coal $23.1M, natural gas $10.4M and oil & petroleum $19M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
571,921 t in 2023, reported to the EPA — the 869th highest of 6,030 US facilities that reported. Down from 852,451 t in 2011.

Related pages

Georgia energyAll facilities in the state→Butler Solar Project 103104 MW operating capacity→ SR Arlington II102 MW operating capacity→ White Pine Solar, LLC101 MW operating capacity→ SR Lumpkin100 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming