Brewton, Escambia County, Alabama · SOCO · operated by Georgia-Pacific Brewton LLC · owned by Koch Industries Inc
2023 · headline year
Fuel spend$34.3M2023 · estimate
Capacity in service103MW3 units · biomass + gas
Net generation491GWh2023 · reported
CO₂ emitted544,667t2023 · reported to EPA · 891st highest of 6,030 in the US
Rank in Alabama#36of 75 · by capacity · #2,312 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor54%2023
Location
What its on-site power plant burns
2023 · reported
Share of reported fuel consumption
53% Black liquor · 8.21 TBtu · reported47% Natural gas · 7.28 TBtu · reported · $34.3M est.
Black liquor supplies 53% of the fuel energy its on-site power plant burned in 2023.
CO₂ emitted, t · 2011–2023
Reported (through 2023)
Generating units
4 of 4 shown · 103 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 4TG
75.0
Black liquor
Wood/Wood Waste Biomass
2017
Operating
Unit 3TG
15.9
Natural Gas
Natural Gas Steam Turbine
1982
Operating
Unit 2TG
12.5
Natural Gas
Natural Gas Steam Turbine
1964
Operating
Unit 1TG
12.5
Black liquor
Wood/Wood Waste Biomass
1957
Retired 2017
All 4 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.
103 MW across 3 generating units in service — 75.0 MW of biomass and 28.4 MW of natural gas. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Owned by Koch Industries Inc (100%) and operated by Georgia-Pacific Brewton LLC, filed as industrial.
Which grid does it sell into?
SOCO (Southern Company Services, Inc. - Trans) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2005. The oldest operating unit is Unit 2TG (1964); the newest is Unit 4TG (2017).
When is it due to retire?
No retirement date has been filed for any operating unit at Georgia-Pacific Brewton LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 its on-site power plant burned black liquor and natural gas.
How much does it spend on fuel?
An estimated $34.3M in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.
How much CO₂ does it emit?
544,667 t in 2023, reported to the EPA — the 891st highest of 6,030 US facilities that reported. Up from 466,581 t in 2011.