AMERICAN ENERGY ATLAS
Power·Colorado

George Birdsall

El Paso County, Colorado · WACM · operated by City of Colorado Springs - (CO)

2023 · headline year
Fuel spend$1.72M2023 · estimate
Capacity in service61.1MW3 units · gas
Net generation31.2GWh2023 · reported
Rank in Colorado#65of 303 · by capacity · #3,208 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor6%2023

Location

El Paso County · WACM · WECC

What it burns

2023 · reported

Share of reported fuel consumption

100% Natural gas · 439,258 MMBtu · reported · $1.69M est.

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 61.1 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 325.0Natural GasNatural Gas Steam Turbine1957Operating
Unit 218.8Natural GasNatural Gas Steam Turbine1954Operating
Unit 117.3Natural GasNatural Gas Steam Turbine1953Operating

All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023. 5 deliveries are on record for 2011.

Delivery history. Subscribe to see every recorded delivery, supplier, mine of origin and transport mode.

See the delivery history →

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
City of Colorado Springs - (CO)
Entity type
Municipally Owned Utility
Regulatory status
Regulated
Balancing authority
WACM
NERC region
WECC
EIA plant ID
493

Common questions

How big is George Birdsall?
61.1 MW across 3 generating units in service.
Who owns and operates it?
Operated by City of Colorado Springs - (CO), filed as municipally owned utility.
Which grid does it sell into?
WACM (Western Area Power Administration - Rocky Mountain Region) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1955. The oldest operating unit is Unit 1 (1953); the newest is Unit 3 (1957).
When is it due to retire?
No retirement date has been filed for any operating unit at George Birdsall. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.72M in 2023 — natural gas $1.69M and oil & petroleum $34,460. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Colorado energyAll facilities in the state→Twin Buttes Wind Project75.0 MW operating capacity→ Spring Canyon Expansion Wind Energy Ctr62.6 MW operating capacity→ Peak View Wind Farm60.8 MW operating capacity→ Palmer Solar60.0 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming