El Paso County, Colorado · WACM · operated by City of Colorado Springs - (CO)
2023 · headline year
Fuel spend$1.72M2023 · estimate
Capacity in service61.1MW3 units · gas
Net generation31.2GWh2023 · reported
Rank in Colorado#65of 303 · by capacity · #3,208 (tied) of 13,147 US
Reported suppliersNot reported2023 · last deliveries 2011
Capacity factor6%2023
Location
What it burns
2023 · reported
Share of reported fuel consumption
100% Natural gas · 439,258 MMBtu · reported · $1.69M est.
Reported fuel consumption, MMBtu · 2011–2023
Reported (through 2023)
Generating units
3 of 3 shown · 61.1 MW in service
Unit
Capacity MW
Fuel
Technology
Online
Status
Unit 3
25.0
Natural Gas
Natural Gas Steam Turbine
1957
Operating
Unit 2
18.8
Natural Gas
Natural Gas Steam Turbine
1954
Operating
Unit 1
17.3
Natural Gas
Natural Gas Steam Turbine
1953
Operating
All 3 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; NOₓ, particulate and mercury controls with compliance years; stack height.
Operated by City of Colorado Springs - (CO), filed as municipally owned utility.
Which grid does it sell into?
WACM (Western Area Power Administration - Rocky Mountain Region) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1955. The oldest operating unit is Unit 1 (1953); the newest is Unit 3 (1957).
When is it due to retire?
No retirement date has been filed for any operating unit at George Birdsall. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned natural gas.
How much does it spend on fuel?
An estimated $1.72M in 2023 — natural gas $1.69M and oil & petroleum $34,460. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.