Genesis Alkali

Sweetwater County, Wyoming · PACE · operated by Genesis Alkali, LLC

2023 · headline year
Fuel spend$37.4M2023 · estimate
Capacity in service27.5MW4 units · coal · 2 more on standby or out of service
Net generation264GWh2023 · reported
Rank in Wyoming#47of 66 · by capacity · #4,132 (tied) of 13,147 US
Reported suppliersNot reported2023

Location

Sweetwater County · PACE · WECC

What it burns

2023 · reported

Share of reported fuel consumption

81% Coal · 10.7 TBtu · reported · $20.1M est.19% Natural gas · 2.51 TBtu · reported · $17.3M est.

Coal supplies 81% of the fuel energy it burned in 2023. Per unit of heat, natural gas costs Genesis Alkali an estimated 3.7× more than coal.

Reported fuel consumption, TBtu · 2011–2023

051015201120172023
Reported (through 2023)

Generating units

6 of 6 shown · 27.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 410.0SubbituminousConventional Steam Coal1972Operating
Unit 510.0SubbituminousConventional Steam Coal1975Out of service
Unit 610.0SubbituminousConventional Steam Coal1975Operating
Unit 34.0SubbituminousConventional Steam Coal1964Operating
Unit 13.5SubbituminousConventional Steam Coal1953Operating
Unit 23.5SubbituminousConventional Steam Coal1953Out of service

All 6 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; co-firing fuels and fuel-switching times; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; stack height.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Genesis Alkali, LLC
Entity type
Industrial
Regulatory status
Not Regulated
Balancing authority
PACE
NERC region
WECC
EIA plant ID
57915

Common questions

How big is Genesis Alkali?
27.5 MW across 4 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Genesis Alkali, LLC, filed as industrial.
Which grid does it sell into?
PACE (PacifiCorp - East) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 1970. The oldest operating unit is Unit 1 (1953); the newest is Unit 6 (1975).
When is it due to retire?
No retirement date has been filed for any operating unit at Genesis Alkali. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned coal and natural gas.
How much does it spend on fuel?
An estimated $37.4M in 2023 — coal $20.1M and natural gas $17.3M. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Wyoming energyAll facilities in the state→Tata Chemicals Soda Ash Partners, LLC30.0 MW operating capacity→ Happy Jack Windpower Project29.4 MW operating capacity→ Barber Creek22.5 MW operating capacity→ Hartzog22.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming