AMERICAN ENERGY ATLAS
Power·California

Genentech-Oceanside Hybrid

San Diego County, California · CAISO · operated by Tesla Inc.

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service6.5MW2 units · solar + storage
Rank in California#829 (tied)of 1,713 · by capacity · #6,239 (tied) of 13,147 US

Location

San Diego County · CAISO · WECC

Generating units

2 of 2 shown · 6.5 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit PV14.5SolarSolar Photovoltaic2016Operating
Unit BA12.0StorageBatteries2016Operating

All 2 units shown. Behind each one, AEA holds the full engineering record: panel technology, tracking and DC capacity; energy capacity in MWh, charge and discharge rates and use cases.

See the engineering record →

Ownership & operations

Operating utility
Tesla Inc.
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
CAISO
NERC region
WECC
EIA plant ID
60231

Common questions

How big is Genentech-Oceanside Hybrid?
6.5 MW across 2 generating units in service — 4.5 MW of solar and 2.0 MW of storage.
Who owns and operates it?
Operated by Tesla Inc., filed as independent power producer.
Which grid does it sell into?
CAISO (California Independent System Operator) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2016. Every operating unit came online in 2016.
When is it due to retire?
No retirement date has been filed for any operating unit at Genentech-Oceanside Hybrid. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Solar Photovoltaic (4.5 MW) and Batteries (2.0 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (batteries and solar photovoltaic) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

California energyAll facilities in the state→Coram Tehachapi6.5 MW operating capacity→ Garnet Wind Energy Center6.5 MW operating capacity→ Summer North Solar6.5 MW operating capacity→ Berrenda Mesa Water District6.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming