AMERICAN ENERGY ATLAS
Power·Texas

Gcwa

Galveston County, Texas · ERCOT · operated by Power Depot Group A, LLC

2023 · headline year
Fuel spend$88,9312023 · estimate
Capacity in service7.2MW12 units · oil
Net generation433MWh2023 · reported
Rank in Texas#742of 941 · by capacity · #6,110 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor1%2023

Location

Galveston County · ERCOT · TRE

What it burns

2023 · reported

Share of reported fuel consumption

100% Oil & petroleum · 4,031 MMBtu · reported · $88,931 est.

Reported fuel consumption, MMBtu · 2022–23

02,0004,0006,00020222023
Reported (through 2023)

Generating units

12 of 12 shown · 7.2 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit IPS10.6Distillate oilPetroleum Liquids2013Operating
Unit IPS20.6Distillate oilPetroleum Liquids2013Operating
Unit IPS30.6Distillate oilPetroleum Liquids2013Operating
Unit IPS40.6Distillate oilPetroleum Liquids2013Operating
Unit IPS50.6Distillate oilPetroleum Liquids2013Operating
Unit IPS60.6Distillate oilPetroleum Liquids2013Operating
Unit IPS70.6Distillate oilPetroleum Liquids2013Operating
Unit IPS80.6Distillate oilPetroleum Liquids2013Operating
Unit MUN10.6Distillate oilPetroleum Liquids2014Operating
Unit MUN20.6Distillate oilPetroleum Liquids2014Operating
Unit MUN30.6Distillate oilPetroleum Liquids2014Operating
Unit MUN40.6Distillate oilPetroleum Liquids2014Operating

All 12 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
Power Depot Group A, LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
ERCOT
NERC region
Texas RE (TRE)
EIA plant ID
65541

Common questions

How big is Gcwa?
7.2 MW across 12 generating units in service.
Who owns and operates it?
Operated by Power Depot Group A, LLC, filed as independent power producer.
Which grid does it sell into?
ERCOT (Electric Reliability Council of Texas, Inc.) is its balancing authority, inside NERC's Texas RE region.
How old is it?
The capacity-weighted average megawatt here came online in 2013. The oldest operating units are Unit IPS1, Unit IPS2, Unit IPS3, Unit IPS4 and 4 more (2013); the newest are Unit MUN1, Unit MUN2, Unit MUN3 and Unit MUN4 (2014).
When is it due to retire?
No retirement date has been filed for any operating unit at Gcwa. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned oil & petroleum.
How much does it spend on fuel?
An estimated $88,931 in 2023. No agency publishes this site's whole fuel bill, so this is an AEA estimate rather than a reported figure.

Related pages

Texas energyAll facilities in the state→Talco Solar Project7.5 MW operating capacity→ Triple Butte I7.5 MW operating capacity→ Heb_cpssadc6.4 MW operating capacity→ OTHERChildrensPlano6.4 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming