AMERICAN ENERGY ATLAS
Power·Nevada

Galena 3 Geothermal Power Plant

Washoe County, Nevada · NEVP · operated by Ormat Nevada Inc

2023 · headline year
Fuel spend$02023 · no purchased fuel
Capacity in service31.6MW2 units · geothermal
Rank in Nevada#61of 111 · by capacity · #3,975 of 13,147 US

Location

Washoe County · NEVP · WECC

Generating units

4 of 4 shown · 31.6 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit OEC3116.0GeothermalGeothermal2018Operating
Unit OEC3215.6GeothermalGeothermal2018Operating
Unit GEN115.0GeothermalGeothermal2008Retired 2018
Unit GEN215.0GeothermalGeothermal2008Retired 2018

All 4 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Ownership & operations

Operating utility
Ormat Nevada Inc
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
NEVP
NERC region
WECC
EIA plant ID
56541

Common questions

How big is Galena 3 Geothermal Power Plant?
31.6 MW across 2 generating units in service. A further 2 units are listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by Ormat Nevada Inc, filed as independent power producer.
Which grid does it sell into?
NEVP (Nevada Power Company) is its balancing authority, inside NERC's WECC region.
How old is it?
The capacity-weighted average megawatt here came online in 2018. Every operating unit came online in 2018.
When is it due to retire?
No retirement date has been filed for any operating unit at Galena 3 Geothermal Power Plant. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it run on?
Geothermal (31.6 MW).
How much does it spend on fuel?
Nothing in 2023 — its units in service (geothermal) burn no fuel, and it reports no fuel consumption to the EIA.

Related pages

Nevada energyAll facilities in the state→North Valley37.0 MW operating capacity→ Tuscarora Geothermal Power Plant32.0 MW operating capacity→ Spectrum Solar PV Power Project30.2 MW operating capacity→ Brady29.5 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming