AMERICAN ENERGY ATLAS
Power·Florida

G2 Energy Marion LLC

Marion County, Florida · FPC · operated by G2 Energy LLC

2023 · headline year
Capacity in service2.4MW2 units · biomass
Net generation8.74GWh2023 · reported
Rank in Florida#289of 310 · by capacity · #9,489 (tied) of 13,147 US
Reported suppliersNot reported2023
Capacity factor42%2023

Location

Marion County · FPC · SERC

What it burns

2023 · reported

Share of reported fuel consumption

100% Landfill gas · 97,861 MMBtu · reported

Reported fuel consumption, MMBtu · 2011–2023

0200,000400,000600,000201120172023
Reported (through 2023)

Generating units

3 of 3 shown · 2.4 MW in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 3571.6Landfill gasLandfill Gas2009Operating
Unit 3600.8Landfill gasLandfill Gas2010Operating
Unit 3581.6Landfill gasLandfill Gas2009Retired 2021

All 3 units shown. Behind each one, AEA holds the generator-level record: start-up fuels, planned uprates, derates and retirements.

See the engineering record →

Who supplies the fuel

2023
No fuel deliveries are reported for 2023.

In the Atlas

Open in the Atlas →

Ownership & operations

Operating utility
G2 Energy LLC
Entity type
Independent Power Producer
Regulatory status
Not Regulated
Balancing authority
FPC
NERC region
SERC
EIA plant ID
57128

Common questions

How big is G2 Energy Marion LLC?
2.4 MW across 2 generating units in service. A further 1 unit is listed as standby, out of service, planned, retired or canceled.
Who owns and operates it?
Operated by G2 Energy LLC, filed as independent power producer.
Which grid does it sell into?
FPC (Progress Energy Florida) is its balancing authority, inside NERC's SERC region.
How old is it?
The capacity-weighted average megawatt here came online in 2009. The oldest operating unit is Unit 357 (2009); the newest is Unit 360 (2010).
When is it due to retire?
No retirement date has been filed for any operating unit at G2 Energy Marion LLC. An absent date means none is currently filed, not that the plant will run indefinitely.
What does it burn, and where does the fuel come from?
In 2023 it burned landfill gas.

Related pages

Florida energyAll facilities in the state→Old Plank Road Solar Farm, LLC3.0 MW operating capacity→ Port Charlotte Energy LLC3.0 MW operating capacity→ Lakeland Electric Co. (FL)-Airport 12.3 MW operating capacity→ Mount Dora Solar Farm F2.1 MW operating capacity→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming