AMERICAN ENERGY ATLAS
Power·North Carolina

G G Allen

Belmont, Gaston County, North Carolina · DUK · operated by Duke Energy Carolinas, LLC · owned by Duke Energy Corp

Generating units retired 20242023 · headline year

Retired — its last generating unit went out of service in 2024, ending 1,148 MW of capacity, 97% coal by fuel energy in 2023.

Reported fuel cost$8.79M2023 · reported deliveries
Retired capacity1,148MW5 units · none in service
CO₂ emitted141,043t2023 · reported to EPA · 1,920th highest of 6,030 in the US
Rank in North Carolina#29of 99 · by reported CO₂ · #1,920 of 6,030 US

Location

Gaston County · DUK · SERC

What it burns

2023 · reported

Share of reported fuel consumption

97% Coal · 1.61 TBtu · reported3% Oil & petroleum · 0.0425 TBtu · reported

Coal supplies 97% of the fuel energy it burned in 2023.

CO₂ emitted, Mt · 2011–2023

0246201120172023
Reported (through 2023)

Generating units

5 of 5 shown · none in service
UnitCapacity MWFuelTechnologyOnlineStatus
Unit 4278.0Bituminous coalConventional Steam Coal1960Retired 2021
Unit 3272.0Bituminous coalConventional Steam Coal1959Retired 2021
Unit 5272.0Bituminous coalConventional Steam Coal1961Retired 2024
Unit 1163.2Bituminous coalConventional Steam Coal1957Retired 2024
Unit 2163.2Bituminous coalConventional Steam Coal1957Retired 2021

All 5 units shown. Behind each one, AEA holds the full engineering record: boiler design and firing type, efficiency at full and half load, turndown ratio; SO₂ scrubber type, sorbent and removal efficiency; NOₓ, particulate and mercury controls with compliance years; cooling system and water source with withdrawal rate; stack height.

See the engineering record →

In the Atlas

Open in the Atlas →

Ownership & operations

Parent company
Duke Energy Corp · 100%
Operating utility
Duke Energy Carolinas, LLC
Entity type
Investor-Owned Utility
Regulatory status
Regulated
Industry sector
Power Plants
EPA facility ID
1000830
Balancing authority
DUK
NERC region
SERC
EIA plant ID
2718

Common questions

How big is G G Allen?
1,148 MW across 5 units, none of which is in service — all retired.
Who owns and operates it?
Owned by Duke Energy Corp (100%) and operated by Duke Energy Carolinas, LLC, filed as investor-owned utility.
Which grid does it sell into?
DUK (Duke Energy Carolinas) is its balancing authority, inside NERC's SERC region.
When is it due to retire?
It has already retired — the last unit retired in 2024.
What does it burn, and where does the fuel come from?
In 2023 it burned coal and oil & petroleum.
How much does it spend on fuel?
Its fuel receipts report a delivered cost of $8.79M in 2023.
How much CO₂ does it emit?
141,043 t in 2023, reported to the EPA — the 1,920th highest of 6,030 US facilities that reported. Down from 3.97 Mt in 2011.

Also at this site

Allen 2 BESSSame site · planned→

Related pages

North Carolina energyAll facilities in the state→Sampson County Disposal, LLC165,070 t CO₂ in 2023→ Cleveland County Landfill143,437 t CO₂ in 2023→ Coastal Regional Solid Waste Management Authority138,925 t CO₂ in 2023→ Alamance County Landfill134,682 t CO₂ in 2023→

Select a state

AlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaGuamHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaPuerto RicoRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUS Virgin IslandsUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyoming